Treguff Farm

Treguff Farm is operational in Vale of Glamorgan with a recorded capacity of 4.4 MW, and has been generating since 2015-02-11.

4.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-02-11
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Vale of Glamorgan
Authority
Wales

Planning and build timeline

Application submitted2013-09-24
Permission granted2014-08-12
11 months after submission
Operational2015-02-11
6 months after consent

Vale of Glamorgan’s record on solar

Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan

Other built sites within 15 km

SiteMWDistance
Garn Solar Farm
Solar Photovoltaics · Operational
7.42.9 km
Llancadle Farm
Solar Photovoltaics · Operational
53.1 km
West Hall Solar Farm
Solar Photovoltaics · Operational
74 km
Sutton Mawr Farm
Solar Photovoltaics · Operational
7.55.7 km
Rosedew Farm
Solar Photovoltaics · Operational
55.8 km
Whitton Mawr
Solar Photovoltaics · Operational
65.9 km
Morfa Farm
Solar Photovoltaics · Operational
26.4 km
Cwm Derwyn Farm
Solar Photovoltaics · Operational
56.7 km

How big is Treguff Farm?

Treguff Farm has a recorded installed capacity of 4.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Treguff Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Treguff Farm approved and built?

The application was submitted on 2013-09-24. Permission was granted on 2014-08-12, 11 months later. The site became operational on 2015-02-11, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2137.