Novarly ParcelRenewable sites

Renewable sitesBabergh Home Solar Scheme

Babergh Home Solar Scheme

Babergh Home Solar Scheme is operational in Babergh with a recorded capacity of 2.8 MW, and has been generating since 2016-06-01.

2.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-06-01
Solar Photovoltaics
Technology
Babergh District Council
Babergh
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2016-06-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Babergh’s record on solar

Babergh has decided 6 solar farms and approved 67%, taking a median of 2.9 months. See every solar farm decision in Babergh

Other built sites within 15 km

SiteMWDistance
Bramford Substation
Battery · Operational
578.7 km
Tye Lane - Solar Farm
Battery · Operational
9.9 km
Tye Lane - Solar Farm
Solar Photovoltaics · Under Construction
49.99.9 km
Bullen Lane - Battery Storage
Battery · Under Construction
10010.8 km
Masons Power Plant Landfill Scheme
Landfill Gas · Operational
5.511.5 km
Boxted Airfield
Solar Photovoltaics · Operational
18.811.8 km
Great Blakenham EfW
EfW Incineration · Operational
2012.2 km
Mid Suffolk Home Solar Scheme
Solar Photovoltaics · Operational
4.813.4 km

How big is Babergh Home Solar Scheme?

Babergh Home Solar Scheme has a recorded installed capacity of 2.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Babergh Home Solar Scheme?

REPD records the operator as Babergh District Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Babergh Home Solar Scheme approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-06-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1893.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council