Renewable sites › Babergh Home Solar Scheme
Babergh Home Solar Scheme
Babergh Home Solar Scheme is operational in Babergh with a recorded capacity of 2.8 MW, and has been generating since 2016-06-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2016-06-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Babergh’s record on solar
Babergh has decided 6 solar farms and approved 67%, taking a median of 2.9 months. See every solar farm decision in Babergh →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Bramford Substation Battery · Operational | 57 | 8.7 km |
Tye Lane - Solar Farm Battery · Operational | — | 9.9 km |
Tye Lane - Solar Farm Solar Photovoltaics · Under Construction | 49.9 | 9.9 km |
Bullen Lane - Battery Storage Battery · Under Construction | 100 | 10.8 km |
Masons Power Plant Landfill Scheme Landfill Gas · Operational | 5.5 | 11.5 km |
Boxted Airfield Solar Photovoltaics · Operational | 18.8 | 11.8 km |
Great Blakenham EfW EfW Incineration · Operational | 20 | 12.2 km |
Mid Suffolk Home Solar Scheme Solar Photovoltaics · Operational | 4.8 | 13.4 km |
How big is Babergh Home Solar Scheme?
Babergh Home Solar Scheme has a recorded installed capacity of 2.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Babergh Home Solar Scheme?
REPD records the operator as Babergh District Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Babergh Home Solar Scheme approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2016-06-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1893.
Novarly Parcel · official public data, read properly · parcel.novarly.com