Brocklesby - Crosslands Lane is operational in East Riding of Yorkshire with a recorded capacity of 3.5 MW, and has been generating since 2017-01-09.

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-01-09
Anaerobic Digestion
Technology
BioConstruct
East Riding of Yorkshire
Authority
England

Planning and build timeline

Application submitted2015-06-05
Permission granted2015-07-06
1 months after submission
Operational2017-01-09
18 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
R G Walter & Sons, Golden Acre Site - Biomass Boilers
Biomass (dedicated) · Operational
0.96.5 km
Sober Hill Wind Farm
Wind Onshore · Operational
157.7 km
Sancton Hill
Wind Onshore · Operational
108.3 km
Gallymoor Landfill
Landfill Gas · Operational
2.98.6 km
Spaldington Airfield
Wind Onshore · Operational
12.59.2 km
Sixpenny Wood Windfarm
Wind Onshore · Operational
3310.7 km
Melton Common Wind Cluster
Wind Onshore · Operational
510.9 km
Melton Waste Park
Wind Onshore · Operational
510.9 km

How big is Brocklesby - Crosslands Lane?

Brocklesby - Crosslands Lane has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Brocklesby - Crosslands Lane?

REPD records the operator as BioConstruct. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Brocklesby - Crosslands Lane approved and built?

The application was submitted on 2015-06-05. Permission was granted on 2015-07-06, 1 months later. The site became operational on 2017-01-09, 18 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5722.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council