Marsh Farm (Farm AD)
Marsh Farm (Farm AD) is operational in Boston with a recorded capacity of 1.4 MW, and has been generating since 2011-02-24.
Planning and build timeline
| Application submitted | 2009-05-21 |
| Permission granted | 2009-08-03 2 months after submission |
| Operational | 2011-02-24 19 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Leverton Ings Solar Photovoltaics · Operational | 12 | 6.5 km |
Low Farm Solar Farm Solar Photovoltaics · Under Construction | 49.9 | 7.4 km |
Staples Anaerobic Digestion CHP Plant (Waste AD) Anaerobic Digestion · Operational | 1.4 | 8.4 km |
Lincoln Farm Solar Photovoltaics · Operational | 11.4 | 12.5 km |
Bicker Fen (previously Manor Farm) Solar Photovoltaics · Operational | 22.6 | 12.9 km |
The Hollies Wind Onshore · Operational | 2.6 | 13.4 km |
Boston Landfill Scheme Landfill Gas · Operational | 1.3 | 13.6 km |
Boston Landfill, Wyberton - Solar PV Array Solar Photovoltaics · Under Construction | 9.7 | 13.7 km |
How big is Marsh Farm (Farm AD)?
Marsh Farm (Farm AD) has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Marsh Farm (Farm AD)?
REPD records the operator as Staples Brothers. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Marsh Farm (Farm AD) approved and built?
The application was submitted on 2009-05-21. Permission was granted on 2009-08-03, 2 months later. The site became operational on 2011-02-24, 19 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 222.