Renewable sites › Boston Landfill Scheme
Boston Landfill Scheme
Boston Landfill Scheme is operational in Boston with a recorded capacity of 1.3 MW, and has been generating since 1999-03-15.
Planning and build timeline
| Application submitted | 1997-11-27 |
| Permission granted | 1998-03-16 4 months after submission |
| Operational | 1999-03-15 12 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Boston Landfill, Wyberton - Solar PV Array Solar Photovoltaics · Under Construction | 9.7 | 0.5 km |
Riverside Industrial Estate Gasification Plant Advanced Conversion Technologies · Operational | 10.5 | 1.3 km |
Marsh Lane - Solar PV Panels Solar Photovoltaics · Under Construction | 0.89 | 1.8 km |
Pinguin Foods Solar Photovoltaics · Operational | 1.5 | 2.2 km |
Fen Road Solar Photovoltaics · Operational | 1.4 | 5.4 km |
Kirton Solar PV Farm Solar Photovoltaics · Operational | 3.2 | 7.2 km |
Canopus Farm Solar Photovoltaics · Operational | 5 | 7.6 km |
Nowhere Farm Solar Photovoltaics · Operational | 8.1 | 8 km |
How big is Boston Landfill Scheme?
Boston Landfill Scheme has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Boston Landfill Scheme?
REPD records the operator as Renewable Power Systems. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Boston Landfill Scheme approved and built?
The application was submitted on 1997-11-27. Permission was granted on 1998-03-16, 4 months later. The site became operational on 1999-03-15, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 752.
Novarly Parcel · official public data, read properly · parcel.novarly.com