Novarly ParcelRenewable sites

Renewable sitesLeverton Ings

Leverton Ings

Leverton Ings is operational in Boston with a recorded capacity of 12 MW, and has been generating since 2014-03-28.

12 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-03-28
Solar Photovoltaics
Technology
Hazel Capital LLP
Boston
Authority
England

Planning and build timeline

Application submitted2013-08-14
Permission granted2013-10-15
2 months after submission
Operational2014-03-28
5 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Boston’s record on solar

Boston has decided 14 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in Boston

Other built sites within 15 km

SiteMWDistance
Staples Anaerobic Digestion CHP Plant (Waste AD)
Anaerobic Digestion · Operational
1.42.7 km
Marsh Farm (Farm AD)
Anaerobic Digestion · Operational
1.46.5 km
Canopus Farm
Solar Photovoltaics · Operational
58 km
Pinguin Foods
Solar Photovoltaics · Operational
1.58.3 km
Boston Landfill, Wyberton - Solar PV Array
Solar Photovoltaics · Under Construction
9.78.4 km
Marsh Lane - Solar PV Panels
Solar Photovoltaics · Under Construction
0.898.4 km
Boston Landfill Scheme
Landfill Gas · Operational
1.38.5 km
Riverside Industrial Estate Gasification Plant
Advanced Conversion Technologies · Operational
10.58.6 km

How big is Leverton Ings?

Leverton Ings has a recorded installed capacity of 12 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Leverton Ings?

REPD records the operator as Hazel Capital LLP. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Leverton Ings approved and built?

The application was submitted on 2013-08-14. Permission was granted on 2013-10-15, 2 months later. The site became operational on 2014-03-28, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1494.