Low Farm Solar Farm
Low Farm Solar Farm is a 49.9 MW solar farm under construction in East Lindsey. Planning permission was granted on 29 March 2021, 3 months after submission. Operator of record: Gresham House / Anesco Limited.
Planning and build timeline
| Application submitted | 22 December 2020 |
| Permission granted | 29 March 2021 3 months after submission |
| Operational | not recorded |
Screening a site of your own?
East Lindsey approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Low Farm Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Lindsey’s record on solar
East Lindsey has decided 28 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in East Lindsey →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 11.4 | 5.1 km |
Solar Photovoltaics · Operational | 22.6 | 5.5 km |
Wind Onshore · Operational | 2.6 | 6.4 km |
Solar Photovoltaics · Operational | 8.6 | 6.5 km |
Anaerobic Digestion · Operational | 1.4 | 7.4 km |
Solar Photovoltaics · Operational | 4.9 | 10 km |
Solar Photovoltaics · Operational | 12 | 11.8 km |
Anaerobic Digestion · Operational | 1.4 | 12.3 km |
How big is Low Farm Solar Farm?
Low Farm Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Low Farm Solar Farm?
REPD records the operator as Gresham House / Anesco Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Low Farm Solar Farm approved and built?
The application was submitted on 22 December 2020. Permission was granted on 29 March 2021, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8053.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode