Novarly ParcelRenewable sites

Renewable sitesLincoln Farm

Lincoln Farm

Lincoln Farm is operational in East Lindsey with a recorded capacity of 11.4 MW, and has been generating since 2016-03-25.

11.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-03-25
Solar Photovoltaics
Technology
juwi Renewable Energies
East Lindsey
Authority
England

Planning and build timeline

Application submitted2014-03-07
Permission granted2014-10-20
7 months after submission
Operational2016-03-25
17 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Lindsey’s record on solar

East Lindsey has decided 28 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in East Lindsey

Other built sites within 15 km

SiteMWDistance
Bicker Fen (previously Manor Farm)
Solar Photovoltaics · Operational
22.60.9 km
THE HOLLIES SOLAR PARK - SKEGNESS
Solar Photovoltaics · Operational
8.62.3 km
The Hollies
Wind Onshore · Operational
2.62.6 km
Low Farm Solar Farm
Solar Photovoltaics · Under Construction
49.95.1 km
Skegness Solar Park
Solar Photovoltaics · Operational
4.96.5 km
Marsh Farm (Farm AD)
Anaerobic Digestion · Operational
1.412.5 km

How big is Lincoln Farm?

Lincoln Farm has a recorded installed capacity of 11.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lincoln Farm?

REPD records the operator as juwi Renewable Energies. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lincoln Farm approved and built?

The application was submitted on 2014-03-07. Permission was granted on 2014-10-20, 7 months later. The site became operational on 2016-03-25, 17 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1826.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council