Renewable sitesStaples Anaerobic Digestion CHP Plant (Waste AD)

Staples Anaerobic Digestion CHP Plant (Waste AD)

Staples Anaerobic Digestion CHP Plant (Waste AD) is an operational 1.4 MW anaerobic digestion plant in East Lindsey, generating since 1 October 2011. Planning permission was granted on 19 July 2010, 0 months after submission. Operator of record: Staples Brothers.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2011
Anaerobic Digestion
Technology
Staples Brothers
East Lindsey
Authority
England

Planning and build timeline

Application submitted8 July 2010
Permission granted19 July 2010
0 months after submission
Operational1 October 2011
14 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in East Lindsey: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Staples Anaerobic Digestion CHP Plant (Waste AD)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
122.7 km
Solar Photovoltaics · Operational
56.4 km
Anaerobic Digestion · Operational
36.9 km
Anaerobic Digestion · Operational
1.48.4 km
Solar Photovoltaics · Operational
1.58.5 km
Solar Photovoltaics · Operational
58.7 km
Solar Photovoltaics · Under Construction
0.898.7 km
Solar Photovoltaics · Under Construction
9.79.1 km

How big is Staples Anaerobic Digestion CHP Plant (Waste AD)?

Staples Anaerobic Digestion CHP Plant (Waste AD) has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Staples Anaerobic Digestion CHP Plant (Waste AD)?

REPD records the operator as Staples Brothers. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Staples Anaerobic Digestion CHP Plant (Waste AD) approved and built?

The application was submitted on 8 July 2010. Permission was granted on 19 July 2010, 0 months later. The site became operational on 1 October 2011, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 291.