Staples Anaerobic Digestion CHP Plant (Waste AD)

Staples Anaerobic Digestion CHP Plant (Waste AD) is operational in East Lindsey with a recorded capacity of 1.4 MW, and has been generating since 2011-10-01.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-10-01
Anaerobic Digestion
Technology
Staples Brothers
East Lindsey
Authority
England

Planning and build timeline

Application submitted2010-07-08
Permission granted2010-07-19
0 months after submission
Operational2011-10-01
14 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Leverton Ings
Solar Photovoltaics · Operational
122.7 km
Canopus Farm
Solar Photovoltaics · Operational
56.4 km
Carrington Farm AD
Anaerobic Digestion · Operational
36.9 km
Marsh Farm (Farm AD)
Anaerobic Digestion · Operational
1.48.4 km
Pinguin Foods
Solar Photovoltaics · Operational
1.58.5 km
Land Off Folly Lane
Solar Photovoltaics · Operational
58.7 km
Marsh Lane - Solar PV Panels
Solar Photovoltaics · Under Construction
0.898.7 km
Boston Landfill, Wyberton - Solar PV Array
Solar Photovoltaics · Under Construction
9.79.1 km

How big is Staples Anaerobic Digestion CHP Plant (Waste AD)?

Staples Anaerobic Digestion CHP Plant (Waste AD) has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Staples Anaerobic Digestion CHP Plant (Waste AD)?

REPD records the operator as Staples Brothers. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Staples Anaerobic Digestion CHP Plant (Waste AD) approved and built?

The application was submitted on 2010-07-08. Permission was granted on 2010-07-19, 0 months later. The site became operational on 2011-10-01, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 291.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council