Renewable sites › Lovedean Farm
Lovedean Farm
Lovedean Farm is operational in East Hampshire with a recorded capacity of 4.5 MW, and has been generating since 2013-03-28.
Planning and build timeline
| Application submitted | 2012-10-02 |
| Permission granted | 2012-12-24 3 months after submission |
| Operational | 2013-03-28 3 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Hampshire’s record on solar
East Hampshire has decided 16 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in East Hampshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Southwick Estate Solar Photovoltaics · Operational | 48 | 4.5 km |
Southleigh Landfill Landfill Gas · Operational | 3.5 | 7.6 km |
Lakeside Business Park Battery · Under Construction | 2 | 8.6 km |
Lakeside Business Park Solar Photovoltaics · Under Construction | 4.5 | 8.6 km |
Paulsgrove Landfill Site Landfill Gas · Operational | 2.4 | 9.4 km |
Portsmouth ERF EfW Incineration · Operational | 14 | 10.1 km |
Portsmouth International Port - Solar Panels Solar Photovoltaics · Under Construction | 1.2 | 11.8 km |
Whitman Laboratories Solar Photovoltaics · Operational | 1 | 12 km |
How big is Lovedean Farm?
Lovedean Farm has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lovedean Farm?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lovedean Farm approved and built?
The application was submitted on 2012-10-02. Permission was granted on 2012-12-24, 3 months later. The site became operational on 2013-03-28, 3 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1449.
Novarly Parcel · official public data, read properly · parcel.novarly.com