Lovedean Farm is operational in East Hampshire with a recorded capacity of 4.5 MW, and has been generating since 2013-03-28.

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-28
Solar Photovoltaics
Technology
Lightsource Renewable Energy
East Hampshire
Authority
England

Planning and build timeline

Application submitted2012-10-02
Permission granted2012-12-24
3 months after submission
Operational2013-03-28
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Hampshire’s record on solar

East Hampshire has decided 16 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in East Hampshire

Other built sites within 15 km

SiteMWDistance
Southwick Estate
Solar Photovoltaics · Operational
484.5 km
Southleigh Landfill
Landfill Gas · Operational
3.57.6 km
Lakeside Business Park
Battery · Under Construction
28.6 km
Lakeside Business Park
Solar Photovoltaics · Under Construction
4.58.6 km
Paulsgrove Landfill Site
Landfill Gas · Operational
2.49.4 km
Portsmouth ERF
EfW Incineration · Operational
1410.1 km
Portsmouth International Port - Solar Panels
Solar Photovoltaics · Under Construction
1.211.8 km
Whitman Laboratories
Solar Photovoltaics · Operational
112 km

How big is Lovedean Farm?

Lovedean Farm has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lovedean Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lovedean Farm approved and built?

The application was submitted on 2012-10-02. Permission was granted on 2012-12-24, 3 months later. The site became operational on 2013-03-28, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1449.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council