Novarly ParcelRenewable sites

Renewable sitesSouthleigh Landfill

Southleigh Landfill

Southleigh Landfill is operational in Havant with a recorded capacity of 3.5 MW, and has been generating since 2003-03-01.

3.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2003-03-01
Landfill Gas
Technology
ONYX LANDFILL LTD
Havant
Authority
England

Planning and build timeline

Application submitted1996-08-06
Permission granted1996-12-10
4 months after submission
Operational2003-03-01
75 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Broadley Copse
Anaerobic Digestion · Operational
2.27.3 km
Lovedean Farm
Solar Photovoltaics · Operational
4.57.6 km
Portsmouth ERF
EfW Incineration · Operational
148.8 km
Lakeside Business Park
Battery · Under Construction
29.2 km
Lakeside Business Park
Solar Photovoltaics · Under Construction
4.59.2 km
Southwick Estate
Solar Photovoltaics · Operational
489.2 km
Paulsgrove Landfill Site
Landfill Gas · Operational
2.410.4 km
Hunters Race Solar Park
Solar Photovoltaics · Operational
9.311.3 km

How big is Southleigh Landfill?

Southleigh Landfill has a recorded installed capacity of 3.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Southleigh Landfill?

REPD records the operator as ONYX LANDFILL LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Southleigh Landfill approved and built?

The application was submitted on 1996-08-06. Permission was granted on 1996-12-10, 4 months later. The site became operational on 2003-03-01, 75 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 667.