Renewable sites › Portsmouth International Port - Solar Panels
Portsmouth International Port - Solar Panels
Portsmouth International Port - Solar Panels is under construction in Portsmouth with a recorded capacity of 1.2 MW.
Planning and build timeline
| Application submitted | 2021-06-10 |
| Permission granted | 2023-06-20 24 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Portsmouth’s record on solar
Portsmouth has decided 17 solar farms and approved 94%, taking a median of 1.7 months. See every solar farm decision in Portsmouth →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
MMD Shipping Services Solar Photovoltaics · Operational | 1.2 | 0.2 km |
Portsmouth ERF EfW Incineration · Operational | 14 | 2.7 km |
Paulsgrove Landfill Site Landfill Gas · Operational | 2.4 | 2.7 km |
Lakeside Business Park Battery · Under Construction | 2 | 3.2 km |
Lakeside Business Park Solar Photovoltaics · Under Construction | 4.5 | 3.2 km |
Newlands Farm Battery Storage Facility Phase 2 Battery · Operational | 40 | 7.6 km |
Newlands Farm Solar Solar Photovoltaics · Operational | 20.5 | 7.9 km |
Southwick Estate Solar Photovoltaics · Operational | 48 | 8.1 km |
How big is Portsmouth International Port - Solar Panels?
Portsmouth International Port - Solar Panels has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Portsmouth International Port - Solar Panels?
REPD records the operator as Portsmouth City Council. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Portsmouth International Port - Solar Panels approved and built?
The application was submitted on 2021-06-10. Permission was granted on 2023-06-20, 24 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9236.
Novarly Parcel · official public data, read properly · parcel.novarly.com