Renewable sites › Portsmouth ERF
Portsmouth ERF
Portsmouth ERF is operational in Portsmouth with a recorded capacity of 14 MW, and has been generating since 2005-03-01.
Planning and build timeline
| Application submitted | 1998-08-14 |
| Permission granted | 2001-10-15 38 months after submission |
| Operational | 2005-03-01 41 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lakeside Business Park Battery · Under Construction | 2 | 2.4 km |
Lakeside Business Park Solar Photovoltaics · Under Construction | 4.5 | 2.4 km |
Portsmouth International Port - Solar Panels Solar Photovoltaics · Under Construction | 1.2 | 2.7 km |
MMD Shipping Services Solar Photovoltaics · Operational | 1.2 | 2.8 km |
Paulsgrove Landfill Site Landfill Gas · Operational | 2.4 | 3.1 km |
Southwick Estate Solar Photovoltaics · Operational | 48 | 7.2 km |
Southleigh Landfill Landfill Gas · Operational | 3.5 | 8.8 km |
Newlands Farm Battery Storage Facility Phase 2 Battery · Operational | 40 | 9.7 km |
How big is Portsmouth ERF?
Portsmouth ERF has a recorded installed capacity of 14 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Portsmouth ERF?
REPD records the operator as Veolia. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Portsmouth ERF approved and built?
The application was submitted on 1998-08-14. Permission was granted on 2001-10-15, 38 months later. The site became operational on 2005-03-01, 41 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1017.
Novarly Parcel · official public data, read properly · parcel.novarly.com