Whitman Laboratories

Whitman Laboratories is an operational 1 MW solar farm in East Hampshire, generating since 18 October 2017. Planning permission was granted on 23 August 2016, 2 months after submission. Operator of record: Whitman Laboratories.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 18 October 2017
Solar Photovoltaics
Technology
Whitman Laboratories
East Hampshire
Authority
England

Planning and build timeline

Application submitted28 June 2016
Permission granted23 August 2016
2 months after submission
Operational18 October 2017
14 months after consent

Screening a site of your own?

RedlineUK · £39

East Hampshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Whitman Laboratories’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

East Hampshire’s record on solar

East Hampshire has decided 16 solar farms and approved 100%, taking a median of 2.9 months. See every solar farm decision in East Hampshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.512 km
Solar Photovoltaics · Operational
5.412.2 km
Solar Photovoltaics · Operational
0.3714.9 km

How big is Whitman Laboratories?

Whitman Laboratories has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Whitman Laboratories?

REPD records the operator as Whitman Laboratories. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Whitman Laboratories approved and built?

The application was submitted on 28 June 2016. Permission was granted on 23 August 2016, 2 months later. The site became operational on 18 October 2017, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6198.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode