Novarly ParcelRenewable sites

Renewable sitesLakeside Business Park

Lakeside Business Park

Lakeside Business Park is a 2 MW battery storage site under construction in Portsmouth. Planning permission was granted on 1 November 2022, 5 months after submission. Operator of record: Custom Solar Limited.

2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Custom Solar Limited
Portsmouth
Authority
England

Planning and build timeline

Application submitted10 June 2022
Permission granted1 November 2022
5 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Portsmouth: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lakeside Business Park’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
4.50 km
Landfill Gas · Operational
2.41.3 km
EfW Incineration · Operational
142.4 km
Solar Photovoltaics · Under Construction
1.23.2 km
Solar Photovoltaics · Operational
1.23.4 km
Solar Photovoltaics · Operational
485.1 km
Battery · Operational
408.2 km
Solar Photovoltaics · Operational
20.58.6 km

How big is Lakeside Business Park?

Lakeside Business Park has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lakeside Business Park?

REPD records the operator as Custom Solar Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lakeside Business Park approved and built?

The application was submitted on 10 June 2022. Permission was granted on 1 November 2022, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 15004.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode