Novarly ParcelRenewable sites

Renewable sitesLonghill Burn Wind Farm

Longhill Burn Wind Farm

Longhill Burn Wind Farm is under construction in West Lothian with a recorded capacity of 45.6 MW.

45.6 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Wind Onshore
Technology
EnergieKontor UK
West Lothian
Authority
Scotland

Planning and build timeline

Application submitted2019-04-15
Permission granted2020-04-17
12 months after submission
Operationalnot recorded

West Lothian’s record on onshore wind

West Lothian has decided 13 onshore wind schemes and approved 85%, taking a median of 11.3 months. See every onshore wind scheme decision in West Lothian

Other built sites within 15 km

SiteMWDistance
Pates Hill
Wind Onshore · Operational
141.1 km
Tormywheel
Wind Onshore · Operational
30.752.9 km
Pearie Law Wind Farm
Wind Onshore · Operational
19.24.2 km
Levenseat Waste Management Facility
Advanced Conversion Technologies · Operational
174.4 km
Levenseat EfW
Advanced Conversion Technologies · Operational
12.54.9 km
Muirhall
Wind Onshore · Operational
12.35.8 km
Harburnhead Wind Farm
Wind Onshore · Operational
51.76 km
Muirhall Extension
Wind Onshore · Operational
6.86.3 km

How big is Longhill Burn Wind Farm?

Longhill Burn Wind Farm has a recorded installed capacity of 45.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Longhill Burn Wind Farm?

REPD records the operator as EnergieKontor UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Longhill Burn Wind Farm approved and built?

The application was submitted on 2019-04-15. Permission was granted on 2020-04-17, 12 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6327.