Pearie Law Wind Farm

Pearie Law Wind Farm is operational in West Lothian with a recorded capacity of 19.2 MW, and has been generating since 2016-12-01.

19.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-12-01
Wind Onshore
Technology
EDF Energy Renewables
West Lothian
Authority
Scotland

Planning and build timeline

Application submitted2012-04-17
Permission granted2014-07-08
27 months after submission
Operational2016-12-01
29 months after consent

West Lothian’s record on onshore wind

West Lothian has decided 13 onshore wind schemes and approved 85%, taking a median of 11.3 months. See every onshore wind scheme decision in West Lothian

Other built sites within 15 km

SiteMWDistance
Harburnhead Wind Farm
Wind Onshore · Operational
51.72.3 km
Pates Hill
Wind Onshore · Operational
143.1 km
Longhill Burn Wind Farm
Wind Onshore · Under Construction
45.64.2 km
Muirhall
Wind Onshore · Operational
12.36.1 km
Tormywheel
Wind Onshore · Operational
30.757.1 km
Muirhall South
Wind Onshore · Operational
8.37.4 km
Muirhall Extension
Wind Onshore · Operational
6.87.4 km
Aldi Distribution Centre
Solar Photovoltaics · Operational
1.38.4 km

How big is Pearie Law Wind Farm?

Pearie Law Wind Farm has a recorded installed capacity of 19.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pearie Law Wind Farm?

REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pearie Law Wind Farm approved and built?

The application was submitted on 2012-04-17. Permission was granted on 2014-07-08, 27 months later. The site became operational on 2016-12-01, 29 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4211.