Pearie Law Wind Farm is operational in West Lothian with a recorded capacity of 19.2 MW, and has been generating since 2016-12-01.
Planning and build timeline
| Application submitted | 2012-04-17 |
| Permission granted | 2014-07-08 27 months after submission |
| Operational | 2016-12-01 29 months after consent |
West Lothian’s record on onshore wind
West Lothian has decided 13 onshore wind schemes and approved 85%, taking a median of 11.3 months. See every onshore wind scheme decision in West Lothian →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Harburnhead Wind Farm Wind Onshore · Operational | 51.7 | 2.3 km |
Pates Hill Wind Onshore · Operational | 14 | 3.1 km |
Longhill Burn Wind Farm Wind Onshore · Under Construction | 45.6 | 4.2 km |
Muirhall Wind Onshore · Operational | 12.3 | 6.1 km |
Tormywheel Wind Onshore · Operational | 30.75 | 7.1 km |
Muirhall South Wind Onshore · Operational | 8.3 | 7.4 km |
Muirhall Extension Wind Onshore · Operational | 6.8 | 7.4 km |
Aldi Distribution Centre Solar Photovoltaics · Operational | 1.3 | 8.4 km |
How big is Pearie Law Wind Farm?
Pearie Law Wind Farm has a recorded installed capacity of 19.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pearie Law Wind Farm?
REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pearie Law Wind Farm approved and built?
The application was submitted on 2012-04-17. Permission was granted on 2014-07-08, 27 months later. The site became operational on 2016-12-01, 29 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4211.