Renewable sites › Levenseat Waste Management Facility
Levenseat Waste Management Facility
Levenseat Waste Management Facility is an operational 17 MW advanced conversion plant in West Lothian, generating since 1 July 2018. Planning permission was granted on 18 April 2017, 5 months after submission. Operator of record: Levenseat.
Planning and build timeline
| Application submitted | 1 December 2016 |
| Permission granted | 18 April 2017 5 months after submission |
| Operational | 1 July 2018 14 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in West Lothian: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Levenseat Waste Management Facility’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 30.75 | 1.5 km |
Advanced Conversion Technologies · Operational | 12.5 | 2.6 km |
Wind Onshore · Under Construction | 45.6 | 4.4 km |
Wind Onshore · Operational | 14 | 5.5 km |
Wind Onshore · Operational | 27.2 | 6 km |
Wind Onshore · Operational | 48.4 | 6 km |
Wind Onshore · Operational | 15 | 6 km |
Wind Onshore · Operational | 124 | 6 km |
How big is Levenseat Waste Management Facility?
Levenseat Waste Management Facility has a recorded installed capacity of 17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Levenseat Waste Management Facility?
REPD records the operator as Levenseat. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Levenseat Waste Management Facility approved and built?
The application was submitted on 1 December 2016. Permission was granted on 18 April 2017, 5 months later. The site became operational on 1 July 2018, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6215.