Novarly ParcelRenewable sites

Renewable sitesBolton Hill WTW

Bolton Hill WTW

Bolton Hill WTW is operational in Pembrokeshire with a recorded capacity of 0.5 MW, and has been generating since 2020-07-01.

0.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2020-07-01
Solar Photovoltaics
Technology
Dwr Cymru Welsh Water
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2018-07-30
Permission granted2018-10-31
3 months after submission
Operational2020-07-01
20 months after consent

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Tiers Cross Solar Farm
Solar Photovoltaics · Operational
242 km
Lawrence Landfill
Wind Onshore · Operational
1.62 km
Popehill Farm
Solar Photovoltaics · Operational
52.6 km
North Tenement
Solar Photovoltaics · Operational
52.8 km
Castle Pill - Repowering
Wind Onshore · Operational
3.24.5 km
Lodge Farm 1
Wind Onshore · Operational
14.8 km
Liddeston Ridge Solar Park (Milford Haven)
Solar Photovoltaics · Operational
55 km
Cuckoo Grove Farm
Solar Photovoltaics · Operational
6.15.6 km

How big is Bolton Hill WTW?

Bolton Hill WTW has a recorded installed capacity of 0.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bolton Hill WTW?

REPD records the operator as Dwr Cymru Welsh Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bolton Hill WTW approved and built?

The application was submitted on 2018-07-30. Permission was granted on 2018-10-31, 3 months later. The site became operational on 2020-07-01, 20 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6768.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council