Llancayo Solar Farm

Llancayo Solar Farm is an operational 3.9 MW solar farm in Monmouthshire, generating since 1 July 2011. Planning permission was granted on 3 June 2011, 2 months after submission. Operator of record: m03 Power.

3.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 2011
Solar Photovoltaics
Technology
m03 Power
Monmouthshire
Authority
Wales

Planning and build timeline

Application submitted16 April 2011
Permission granted3 June 2011
2 months after submission
Operational1 July 2011
1 months after consent

Screening a site of your own?

RedlineUK · £39

Monmouthshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Llancayo Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Monmouthshire’s record on solar

Monmouthshire has decided 10 solar farms and approved 100%, taking a median of 4.4 months. See every solar farm decision in Monmouthshire

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
0.991.4 km
Solar Photovoltaics · Operational
8.12.4 km
Solar Photovoltaics · Operational
55.4 km
Solar Photovoltaics · Under Construction
329.2 km
Solar Photovoltaics · Operational
10.512.5 km
Solar Photovoltaics · Operational
412.6 km
Solar Photovoltaics · Operational
2.513.6 km
Solar Photovoltaics · Operational
8.513.8 km

How big is Llancayo Solar Farm?

Llancayo Solar Farm has a recorded installed capacity of 3.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Llancayo Solar Farm?

REPD records the operator as m03 Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Llancayo Solar Farm approved and built?

The application was submitted on 16 April 2011. Permission was granted on 3 June 2011, 2 months later. The site became operational on 1 July 2011, 1 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1056.