Renewable sites › Penpergwm Solar Farm (Great House Farm)
Penpergwm Solar Farm (Great House Farm)
Penpergwm Solar Farm (Great House Farm) is under construction in Welsh Government (NSIP) with a recorded capacity of 32 MW.
Planning and build timeline
| Application submitted | 2022-01-25 |
| Permission granted | 2023-01-17 12 months after submission |
| Operational | not recorded |
Welsh Government (NSIP)’s record on solar
Welsh Government (NSIP) has decided 23 solar farms and approved 87%, taking a median of 14.2 months. See every solar farm decision in Welsh Government (NSIP) →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Manor Farm (Monmouthshire) Solar Photovoltaics · Operational | 10.5 | 5.3 km |
Land at Lower House Farm Solar Photovoltaics · Operational | 8.1 | 7.3 km |
Clytha Road - Biomass Boiler Unit Biomass (dedicated) · Operational | 0.99 | 7.9 km |
Llancayo Solar Farm Solar Photovoltaics · Operational | 3.9 | 9.2 km |
Mamhilad Solar Farm Solar Photovoltaics · Operational | 5 | 9.5 km |
How big is Penpergwm Solar Farm (Great House Farm)?
Penpergwm Solar Farm (Great House Farm) has a recorded installed capacity of 32 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Penpergwm Solar Farm (Great House Farm)?
REPD records the operator as Renewable Connections Developments Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Penpergwm Solar Farm (Great House Farm) approved and built?
The application was submitted on 2022-01-25. Permission was granted on 2023-01-17, 12 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10035.