Novarly ParcelRenewable sites

Renewable sitesLand at Lower House Farm

Land at Lower House Farm

Land at Lower House Farm is an operational 8.1 MW solar farm in Monmouthshire, generating since 21 March 2016. Planning permission was granted on 10 December 2012, 4 months after submission. Operator of record: 3C Energy.

8.1 MW
Capacity
as recorded in REPD
Operational
Status
since 21 March 2016
Solar Photovoltaics
Technology
3C Energy
Monmouthshire
Authority
Wales

Planning and build timeline

Application submitted8 August 2012
Permission granted10 December 2012
4 months after submission
Operational21 March 2016
39 months after consent

Screening a site of your own?

RedlineUK · £39

Monmouthshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land at Lower House Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Monmouthshire’s record on solar

Monmouthshire has decided 10 solar farms and approved 100%, taking a median of 4.4 months. See every solar farm decision in Monmouthshire

Other built sites within 15 km

SiteMWDistance
Biomass (dedicated) · Operational
0.991.8 km
Solar Photovoltaics · Operational
3.92.4 km
Solar Photovoltaics · Operational
54.1 km
Solar Photovoltaics · Under Construction
327.3 km
Solar Photovoltaics · Operational
10.511.3 km
Solar Photovoltaics · Operational
413.1 km
Solar Photovoltaics · Operational
1414.7 km

How big is Land at Lower House Farm?

Land at Lower House Farm has a recorded installed capacity of 8.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Lower House Farm?

REPD records the operator as 3C Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Lower House Farm approved and built?

The application was submitted on 8 August 2012. Permission was granted on 10 December 2012, 4 months later. The site became operational on 21 March 2016, 39 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5006.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode