Land at Lower House Farm is operational in Monmouthshire with a recorded capacity of 8.1 MW, and has been generating since 2016-03-21.
Planning and build timeline
| Application submitted | 2012-08-08 |
| Permission granted | 2012-12-10 4 months after submission |
| Operational | 2016-03-21 39 months after consent |
Monmouthshire’s record on solar
Monmouthshire has decided 10 solar farms and approved 100%, taking a median of 4.4 months. See every solar farm decision in Monmouthshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Clytha Road - Biomass Boiler Unit Biomass (dedicated) · Operational | 0.99 | 1.8 km |
Llancayo Solar Farm Solar Photovoltaics · Operational | 3.9 | 2.4 km |
Mamhilad Solar Farm Solar Photovoltaics · Operational | 5 | 4.1 km |
Penpergwm Solar Farm (Great House Farm) Solar Photovoltaics · Under Construction | 32 | 7.3 km |
Manor Farm (Monmouthshire) Solar Photovoltaics · Operational | 10.5 | 11.3 km |
Land to North West of Lodge Farm (Park Farm) Solar Photovoltaics · Operational | 4 | 13.1 km |
Hafod-Y-Dafal Farm Solar Photovoltaics · Operational | 14 | 14.7 km |
How big is Land at Lower House Farm?
Land at Lower House Farm has a recorded installed capacity of 8.1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land at Lower House Farm?
REPD records the operator as 3C Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land at Lower House Farm approved and built?
The application was submitted on 2012-08-08. Permission was granted on 2012-12-10, 4 months later. The site became operational on 2016-03-21, 39 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5006.