Novarly ParcelRenewable sites

Renewable sitesLand to North West of Lodge Farm (Park Farm)

Land to North West of Lodge Farm (Park Farm)

Land to North West of Lodge Farm (Park Farm) is operational in Newport with a recorded capacity of 4 MW, and has been generating since 2017-03-03.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-03
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Newport
Authority
Wales

Planning and build timeline

Application submitted2015-07-23
Permission granted2016-02-08
7 months after submission
Operational2017-03-03
13 months after consent

Newport’s record on solar

Newport has decided 13 solar farms and approved 85%, taking a median of 6.6 months. See every solar farm decision in Newport

Other built sites within 15 km

SiteMWDistance
Geraint Thomas National Velodrome - Solar
Solar Photovoltaics · Operational
5.6 km
Langstone Court Road Solar Farm
Solar Photovoltaics · Operational
2.55.9 km
Traston Road
Battery · Operational
206 km
Cwrt Henllys Farm
Solar Photovoltaics · Operational
56 km
Solutia UK Ltd
Wind Onshore · Operational
56.3 km
Docksway Landfill Scheme
Landfill Gas · Operational
26.4 km
Liberty Steel Power Station
Biomass (dedicated) · Operational
96.8 km
ANP Newport Wind Turbine
Wind Onshore · Operational
2.37.2 km

How big is Land to North West of Lodge Farm (Park Farm)?

Land to North West of Lodge Farm (Park Farm) has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land to North West of Lodge Farm (Park Farm)?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land to North West of Lodge Farm (Park Farm) approved and built?

The application was submitted on 2015-07-23. Permission was granted on 2016-02-08, 7 months later. The site became operational on 2017-03-03, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5531.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council