Land to North West of Lodge Farm (Park Farm) is operational in Newport with a recorded capacity of 4 MW, and has been generating since 2017-03-03.
Planning and build timeline
| Application submitted | 2015-07-23 |
| Permission granted | 2016-02-08 7 months after submission |
| Operational | 2017-03-03 13 months after consent |
Newport’s record on solar
Newport has decided 13 solar farms and approved 85%, taking a median of 6.6 months. See every solar farm decision in Newport →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Geraint Thomas National Velodrome - Solar Solar Photovoltaics · Operational | — | 5.6 km |
Langstone Court Road Solar Farm Solar Photovoltaics · Operational | 2.5 | 5.9 km |
Traston Road Battery · Operational | 20 | 6 km |
Cwrt Henllys Farm Solar Photovoltaics · Operational | 5 | 6 km |
Solutia UK Ltd Wind Onshore · Operational | 5 | 6.3 km |
Docksway Landfill Scheme Landfill Gas · Operational | 2 | 6.4 km |
Liberty Steel Power Station Biomass (dedicated) · Operational | 9 | 6.8 km |
ANP Newport Wind Turbine Wind Onshore · Operational | 2.3 | 7.2 km |
How big is Land to North West of Lodge Farm (Park Farm)?
Land to North West of Lodge Farm (Park Farm) has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Land to North West of Lodge Farm (Park Farm)?
REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Land to North West of Lodge Farm (Park Farm) approved and built?
The application was submitted on 2015-07-23. Permission was granted on 2016-02-08, 7 months later. The site became operational on 2017-03-03, 13 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5531.