Clytha Road - Biomass Boiler Unit is an operational 0.99 MW biomass plant in Monmouthshire, generating since 1 October 2022. Planning permission was granted on 24 October 2022, 4 months after submission. Operator of record: Alkana Corporation Limited.
Planning and build timeline
| Application submitted | 27 June 2022 |
| Permission granted | 24 October 2022 4 months after submission |
| Operational | 1 October 2022 |
Screening a site of your own?
Redline runs the record on your own boundary in Monmouthshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Clytha Road - Biomass Boiler Unit’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 3.9 | 1.4 km |
Solar Photovoltaics · Operational | 8.1 | 1.8 km |
Solar Photovoltaics · Operational | 5 | 5.7 km |
Solar Photovoltaics · Under Construction | 32 | 7.9 km |
Solar Photovoltaics · Operational | 10.5 | 11.1 km |
Solar Photovoltaics · Operational | 4 | 13.8 km |
Solar Photovoltaics · Operational | 2.5 | 14.9 km |
How big is Clytha Road - Biomass Boiler Unit?
Clytha Road - Biomass Boiler Unit has a recorded installed capacity of 0.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Clytha Road - Biomass Boiler Unit?
REPD records the operator as Alkana Corporation Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Clytha Road - Biomass Boiler Unit approved and built?
The application was submitted on 27 June 2022. Permission was granted on 24 October 2022, 4 months later. The site became operational on 1 October 2022.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11817.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode