Clytha Road - Biomass Boiler Unit
Clytha Road - Biomass Boiler Unit is operational in Monmouthshire with a recorded capacity of 0.99 MW, and has been generating since 2022-10-01.
Planning and build timeline
| Application submitted | 2022-06-27 |
| Permission granted | 2022-10-24 4 months after submission |
| Operational | 2022-10-01 |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Llancayo Solar Farm Solar Photovoltaics · Operational | 3.9 | 1.4 km |
Land at Lower House Farm Solar Photovoltaics · Operational | 8.1 | 1.8 km |
Mamhilad Solar Farm Solar Photovoltaics · Operational | 5 | 5.7 km |
Penpergwm Solar Farm (Great House Farm) Solar Photovoltaics · Under Construction | 32 | 7.9 km |
Manor Farm (Monmouthshire) Solar Photovoltaics · Operational | 10.5 | 11.1 km |
Land to North West of Lodge Farm (Park Farm) Solar Photovoltaics · Operational | 4 | 13.8 km |
Langstone Court Road Solar Farm Solar Photovoltaics · Operational | 2.5 | 14.9 km |
How big is Clytha Road - Biomass Boiler Unit?
Clytha Road - Biomass Boiler Unit has a recorded installed capacity of 0.99 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Clytha Road - Biomass Boiler Unit?
REPD records the operator as Alkana Corporation Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Clytha Road - Biomass Boiler Unit approved and built?
The application was submitted on 2022-06-27. Permission was granted on 2022-10-24, 4 months later. The site became operational on 2022-10-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11817.