Renewable sites › Court Farm
Court Farm
Court Farm is an operational 8.5 MW solar farm in Newport, generating since 30 March 2017. Planning permission was granted on 9 October 2015, 7 months after submission. Operator of record: BE Renewables.
Planning and build timeline
| Application submitted | 5 March 2015 |
| Permission granted | 9 October 2015 7 months after submission |
| Operational | 30 March 2017 18 months after consent |
Screening a site of your own?
Newport approves 85% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Court Farm’s recorded coordinate — swap in your own postcode or coordinates.
Newport’s record on solar
Newport has decided 13 solar farms and approved 85%, taking a median of 6.6 months. See every solar farm decision in Newport →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 2.5 | 2.3 km |
Wind Onshore · Operational | 3.5 | 4 km |
Solar Photovoltaics · Operational | 75 | 4.7 km |
Battery · Operational | — | 6.1 km |
Solar Photovoltaics · Operational | — | 6.2 km |
Wind Onshore · Operational | 5 | 7 km |
Battery · Operational | 20 | 7.1 km |
Biomass (dedicated) · Operational | 9 | 7.3 km |
How big is Court Farm?
Court Farm has a recorded installed capacity of 8.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Court Farm?
REPD records the operator as BE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Court Farm approved and built?
The application was submitted on 5 March 2015. Permission was granted on 9 October 2015, 7 months later. The site became operational on 30 March 2017, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5084.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode