Liverpool Energy Management Facility

Liverpool Energy Management Facility is an operational 49.9 MW battery storage site in Liverpool, generating since 1 March 2022. Planning permission was granted on 10 November 2020, 9 months after submission. Operator of record: Statkraft UK.

49.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 March 2022
Battery
Technology
Statkraft UK
Liverpool
Authority
England

Planning and build timeline

Application submitted21 February 2020
Permission granted10 November 2020
9 months after submission
Operational1 March 2022
16 months after consent

Screening a site of your own?

RedlineUK · £39

Liverpool approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Liverpool Energy Management Facility’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Liverpool’s record on battery storage

Liverpool has decided 9 battery storage schemes and approved 100%, taking a median of 6.8 months. See every battery storage scheme decision in Liverpool

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.90 km
Battery · Operational
200 km
Battery · Under Construction
205.9 km
Wind Onshore · Operational
106.1 km
Landfill Gas · Operational
37.9 km
Battery · Operational
28.5 km
Landfill Gas · Operational
3.78.7 km
Wind Onshore · Operational
39 km

How big is Liverpool Energy Management Facility?

Liverpool Energy Management Facility has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Liverpool Energy Management Facility?

REPD records the operator as Statkraft UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Liverpool Energy Management Facility approved and built?

The application was submitted on 21 February 2020. Permission was granted on 10 November 2020, 9 months later. The site became operational on 1 March 2022, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7772.