Hawthorne Road
Hawthorne Road is a 20 MW battery storage site under construction in Sefton. Planning permission was granted on 29 March 2022, 26 months after submission. Operator of record: Bluefield Renewable Developments.
Planning and build timeline
| Application submitted | 29 January 2020 |
| Permission granted | 29 March 2022 26 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Sefton: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Hawthorne Road’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 10 | 1.6 km |
Wind Onshore · Operational | 3 | 3.6 km |
Battery · Operational | 20 | 5.9 km |
Battery · Operational | 49.9 | 5.9 km |
Battery · Operational | 49.9 | 5.9 km |
Solar Photovoltaics · Under Construction | 0.63 | 6.7 km |
Battery · Operational | 2 | 6.9 km |
Landfill Gas · Operational | 2.3 | 8.1 km |
How big is Hawthorne Road?
Hawthorne Road has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hawthorne Road?
REPD records the operator as Bluefield Renewable Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hawthorne Road approved and built?
The application was submitted on 29 January 2020. Permission was granted on 29 March 2022, 26 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7800.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode