Novarly ParcelRenewable sites

Renewable sitesBromborough Dock

Bromborough Dock

Bromborough Dock is operational in Wirral with a recorded capacity of 3.7 MW, and has been generating since 1999-09-01.

3.7 MW
Capacity
as recorded in REPD
Operational
Status
since 1999-09-01
Landfill Gas
Technology
Biffa
Wirral
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1999-09-01

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bromborough Dock Landfill Scheme
Landfill Gas · Operational
30.9 km
Hooton Park
Advanced Conversion Technologies · Under Construction
285.2 km
Aldi Distribution Centre - Neston
Solar Photovoltaics · Operational
1.27.4 km
Burbo Bank Energy Storage
Battery · Operational
28.7 km
Liverpool Energy Management Facility
Battery · Operational
49.98.7 km
Lister Drive
Battery · Operational
49.98.7 km
Land at Carnegie Road
Battery · Operational
208.7 km
Capenhurst Lane, Capenhurst - Battery storage
Battery · Under Construction
579.1 km

How big is Bromborough Dock?

Bromborough Dock has a recorded installed capacity of 3.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bromborough Dock?

REPD records the operator as Biffa. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bromborough Dock approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1999-09-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 657.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council