Renewable sites › Lister Drive
Lister Drive
Lister Drive is operational in Liverpool with a recorded capacity of 49.9 MW.
Planning and build timeline
| Application submitted | 2020-02-04 |
| Permission granted | 2021-03-02 13 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Liverpool’s record on battery storage
Liverpool has decided 9 battery storage schemes and approved 100%, taking a median of 6.8 months. See every battery storage scheme decision in Liverpool →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Liverpool Energy Management Facility Battery · Operational | 49.9 | 0 km |
Land at Carnegie Road Battery · Operational | 20 | 0 km |
Hawthorne Road Battery · Under Construction | 20 | 5.9 km |
Port of Liverpool - wind Wind Onshore · Operational | 10 | 6.1 km |
Bromborough Dock Landfill Scheme Landfill Gas · Operational | 3 | 7.9 km |
Burbo Bank Energy Storage Battery · Operational | 2 | 8.5 km |
Bromborough Dock Landfill Gas · Operational | 3.7 | 8.7 km |
Royal Seaforth Dock Wind Farm Wind Onshore · Operational | 3 | 9 km |
How big is Lister Drive?
Lister Drive has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lister Drive?
REPD records the operator as Arenko Cleantech / Stratcraft. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lister Drive approved and built?
The application was submitted on 2020-02-04. Permission was granted on 2021-03-02, 13 months later. REPD does not record an operational date.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7740.