Burbo Bank Energy Storage is operational in Wirral with a recorded capacity of 2 MW, and has been generating since 2018-12-24.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-12-24
Battery
Technology
�rsted
Wirral
Authority
England

Planning and build timeline

Application submitted2017-04-14
Permission grantednot recorded
Operational2018-12-24

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Bidston Moss Landfill Scheme
Landfill Gas · Operational
2.31.4 km
Port of Liverpool - wind
Wind Onshore · Operational
105.3 km
Royal Seaforth Dock Wind Farm
Wind Onshore · Operational
36 km
Hawthorne Road
Battery · Under Construction
206.9 km
Bromborough Dock Landfill Scheme
Landfill Gas · Operational
38 km
Land at Carnegie Road
Battery · Operational
208.5 km
Lister Drive
Battery · Operational
49.98.5 km
Liverpool Energy Management Facility
Battery · Operational
49.98.5 km

How big is Burbo Bank Energy Storage?

Burbo Bank Energy Storage has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Burbo Bank Energy Storage?

REPD records the operator as �rsted. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Burbo Bank Energy Storage approved and built?

The application was submitted on 2017-04-14. REPD does not record a grant date. The site became operational on 2018-12-24.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6992.