Renewable sitesLand at Carnegie Road

Land at Carnegie Road

Land at Carnegie Road is operational in Liverpool with a recorded capacity of 20 MW, and has been generating since 2018-12-24.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 2018-12-24
Battery
Technology
�rsted
Liverpool
Authority
England

Planning and build timeline

Application submitted2016-11-01
Permission grantednot recorded
Operational2018-12-24

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Liverpool’s record on battery storage

Liverpool has decided 9 battery storage schemes and approved 100%, taking a median of 6.8 months. See every battery storage scheme decision in Liverpool

Other built sites within 15 km

SiteMWDistance
Liverpool Energy Management Facility
Battery · Operational
49.90 km
Lister Drive
Battery · Operational
49.90 km
Hawthorne Road
Battery · Under Construction
205.9 km
Port of Liverpool - wind
Wind Onshore · Operational
106.1 km
Bromborough Dock Landfill Scheme
Landfill Gas · Operational
37.9 km
Burbo Bank Energy Storage
Battery · Operational
28.5 km
Bromborough Dock
Landfill Gas · Operational
3.78.7 km
Royal Seaforth Dock Wind Farm
Wind Onshore · Operational
39 km

How big is Land at Carnegie Road?

Land at Carnegie Road has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Carnegie Road?

REPD records the operator as �rsted. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Carnegie Road approved and built?

The application was submitted on 2016-11-01. REPD does not record a grant date. The site became operational on 2018-12-24.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7155.

Novarly Parcel · official public data, read properly · parcel.novarly.com