Land at Carnegie Road is an operational 20 MW battery storage site in Liverpool, generating since 24 December 2018. REPD does not record the planning grant date. Operator of record: �rsted.

20 MW
Capacity
as recorded in REPD
Operational
Status
since 24 December 2018
Battery
Technology
�rsted
Liverpool
Authority
England

Planning and build timeline

Application submitted1 November 2016
Permission grantednot recorded
Operational24 December 2018

Screening a site of your own?

RedlineUK · £39

Liverpool approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Land at Carnegie Road’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Liverpool’s record on battery storage

Liverpool has decided 9 battery storage schemes and approved 100%, taking a median of 6.8 months. See every battery storage scheme decision in Liverpool

Other built sites within 15 km

SiteMWDistance
Battery · Operational
49.90 km
Battery · Operational
49.90 km
Battery · Under Construction
205.9 km
Wind Onshore · Operational
106.1 km
Landfill Gas · Operational
37.9 km
Battery · Operational
28.5 km
Landfill Gas · Operational
3.78.7 km
Wind Onshore · Operational
39 km

How big is Land at Carnegie Road?

Land at Carnegie Road has a recorded installed capacity of 20 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Land at Carnegie Road?

REPD records the operator as �rsted. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Land at Carnegie Road approved and built?

The application was submitted on 1 November 2016. REPD does not record a grant date. The site became operational on 24 December 2018.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7155.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode