Liberty Steel Dalzell

Liberty Steel Dalzell is operational in North Lanarkshire with a recorded capacity of 17 MW, and has been generating since 2017-03-30.

17 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-30
Biomass (dedicated)
Technology
SIMEC/ Liberty House
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2017-03-30

Other built sites within 15 km

SiteMWDistance
Wishaw Battery Storage Facility
Battery · Operational
49.993.5 km
Greengairs Landfill Scheme Phase I
Landfill Gas · Operational
1.94 km
Hamilton Waste Water Treatment Works - Hydro Scheme
Small Hydro · Operational
4.6 km
Auchinlea Landfill Site
Landfill Gas · Operational
2.35.7 km
Coatbridge Material Recovery and Renewable Energy Facility
Advanced Conversion Technologies · Under Construction
256 km
The Rosti Factory
Wind Onshore · Operational
2.27.2 km
Henry Colbeck Office
Solar Photovoltaics · Operational
0.27.5 km
Damhead Farm
Wind Onshore · Operational
2.57.9 km

How big is Liberty Steel Dalzell?

Liberty Steel Dalzell has a recorded installed capacity of 17 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Liberty Steel Dalzell?

REPD records the operator as SIMEC/ Liberty House. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Liberty Steel Dalzell approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2017-03-30.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6731.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council