Auchinlea Landfill Site is an operational 2.3 MW landfill gas site in North Lanarkshire, generating since 1 November 2002. REPD does not record the planning grant date. Operator of record: Natural Power.

2.3 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2002
Landfill Gas
Technology
Natural Power
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational1 November 2002

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Lanarkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Auchinlea Landfill Site’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.92.6 km
Battery · Operational
49.995.1 km
Wind Onshore · Operational
8.45.3 km
Wind Onshore · Operational
2.55.4 km
Solar Photovoltaics · Under Construction
0.235.6 km
Biomass (dedicated) · Operational
175.7 km
Advanced Conversion Technologies · Under Construction
257.6 km
Wind Onshore · Under Construction
8.48.5 km

How big is Auchinlea Landfill Site?

Auchinlea Landfill Site has a recorded installed capacity of 2.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Auchinlea Landfill Site?

REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Auchinlea Landfill Site approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1 November 2002.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 716.