Renewable sitesHamilton Waste Water Treatment Works - Hydro Scheme

Hamilton Waste Water Treatment Works - Hydro Scheme

Hamilton Waste Water Treatment Works - Hydro Scheme is operational in South Lanarkshire, and has been generating since 2024-07-30.

Capacity
as recorded in REPD
Operational
Status
since 2024-07-30
Small Hydro
Technology
Scottish Water
South Lanarkshire
Authority
Scotland

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2024-07-30

Other built sites within 15 km

SiteMWDistance
Liberty Steel Dalzell
Biomass (dedicated) · Operational
174.6 km
Allers Wastewater Treatment Works, Barrie Road - Solar Pv Array
Solar Photovoltaics · Operational
0.245.3 km
Coatbridge Material Recovery and Renewable Energy Facility
Advanced Conversion Technologies · Under Construction
255.8 km
Blantyre Muir Wind Farm extension
Wind Onshore · Operational
7.56.3 km
Blantyre Muir Wind Farm
Wind Onshore · Operational
96.3 km
Greenoakhill
Landfill Gas · Operational
3.96.9 km
Henry Colbeck Office
Solar Photovoltaics · Operational
0.27 km
Greengairs Landfill Scheme Phase I
Landfill Gas · Operational
1.97.5 km

How big is Hamilton Waste Water Treatment Works - Hydro Scheme?

REPD does not record an installed capacity for Hamilton Waste Water Treatment Works - Hydro Scheme.

Who operates Hamilton Waste Water Treatment Works - Hydro Scheme?

REPD records the operator as Scottish Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hamilton Waste Water Treatment Works - Hydro Scheme approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2024-07-30.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14023.