Novarly ParcelRenewable sites

Renewable sitesCoatbridge Material Recovery and Renewable Energy Facility

Coatbridge Material Recovery and Renewable Energy Facility

Coatbridge Material Recovery and Renewable Energy Facility is a 25 MW advanced conversion plant under construction in North Lanarkshire. Planning permission was granted on 27 May 2011, 23 months after submission. Operator of record: Golder Associates (UK) Ltd/ Shore Energy.

25 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
Golder Associates (UK) Ltd/ Shore Energy
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted22 June 2009
Permission granted27 May 2011
23 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in North Lanarkshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Coatbridge Material Recovery and Renewable Energy Facility’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
0.21.5 km
Wind Onshore · Operational
2.54.9 km
Landfill Gas · Operational
1.95.1 km
Small Hydro · Operational
5.8 km
Biomass (dedicated) · Operational
176 km
Landfill Gas · Operational
2.37.6 km
Landfill Gas · Operational
3.97.8 km
Landfill Gas · Operational
28.2 km

How big is Coatbridge Material Recovery and Renewable Energy Facility?

Coatbridge Material Recovery and Renewable Energy Facility has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Coatbridge Material Recovery and Renewable Energy Facility?

REPD records the operator as Golder Associates (UK) Ltd/ Shore Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Coatbridge Material Recovery and Renewable Energy Facility approved and built?

The application was submitted on 22 June 2009. Permission was granted on 27 May 2011, 23 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1007.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode