Coatbridge Material Recovery and Renewable Energy Facility

Coatbridge Material Recovery and Renewable Energy Facility is under construction in North Lanarkshire with a recorded capacity of 25 MW.

25 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Advanced Conversion Technologies
Technology
Golder Associates (UK) Ltd/ Shore Energy
North Lanarkshire
Authority
Scotland

Planning and build timeline

Application submitted2009-06-22
Permission granted2011-05-27
23 months after submission
Operationalnot recorded

Other built sites within 15 km

SiteMWDistance
Henry Colbeck Office
Solar Photovoltaics · Operational
0.21.5 km
Damhead Farm
Wind Onshore · Operational
2.54.9 km
Greengairs Landfill Scheme Phase I
Landfill Gas · Operational
1.95.1 km
Hamilton Waste Water Treatment Works - Hydro Scheme
Small Hydro · Operational
5.8 km
Liberty Steel Dalzell
Biomass (dedicated) · Operational
176 km
Auchinlea Landfill Site
Landfill Gas · Operational
2.37.6 km
Greenoakhill
Landfill Gas · Operational
3.97.8 km
Greengairs Landfill Scheme Phase VI
Landfill Gas · Operational
2.28.2 km

How big is Coatbridge Material Recovery and Renewable Energy Facility?

Coatbridge Material Recovery and Renewable Energy Facility has a recorded installed capacity of 25 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Coatbridge Material Recovery and Renewable Energy Facility?

REPD records the operator as Golder Associates (UK) Ltd/ Shore Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Coatbridge Material Recovery and Renewable Energy Facility approved and built?

The application was submitted on 2009-06-22. Permission was granted on 2011-05-27, 23 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1007.