Solar planning in Boston

Boston has decided 14 solar farms and approved 100% of them, taking a median of 2.7 months to decide. Consented capacity: 119 MW.

100%
Approved
14 granted · 0 refused
2.7 mo
Median decision
UK 2.3 mo
119 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

How Boston compares

Against the 298 UK authorities with 5+ solar decisions, Boston sits in the 77th percentile for approval rate (7 points above the England average) and the 42nd percentile for speed.

Decisions by year

35Approved — 2 (2013)213Approved — 2 (2014)214Approved — 2 (2015)215Approved — 1 (2021)121Approved — 3 (2022)322Approved — 3 (2023)323Approved — 1 (2024)124
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (14)

SchemeMWStatusDecided
Vicarage Drove - Solar farm & Battery storage
Renewable Connections Developments Limited · B/21/0443 · 27.6 mo to decide
49.9Awaiting Construction2024-01-23
Marsh Farm, Sea Lane - Solar Array
Staples Brothers Limited · B/23/0034 · 3.3 mo to decide
1.89Awaiting Construction2023-05-10
Greenyard Frozen, Marsh Lane - Solar Panels
Mistral Renewable Energy Limited · B/23/0033 · 3.4 mo to decide
0.45Awaiting Construction2023-05-09
TB Containers Limited, Brenton Villa - Solar Panels
TB Containers Limited · B/22/0487 · 1.8 mo to decide
0.38Awaiting Construction2023-01-18
Marsh Lane - Solar PV Panels
Howard Tenens Limited · B/22/0169 · 1.8 mo to decide
0.89Under Construction2022-06-14
Riverside Industrial Estate - Solar PV Panels
Howard Tenens Associates Limited · B/22/0170 · 1.8 mo to decide
0.89Awaiting Construction2022-06-14
Boston Landfill, Wyberton - Solar PV Array
Infinis Solar Developments Limited · PL/0079/21 · 7.4 mo to decide
9.7Under Construction2022-01-21
Station Road, Swineshead - Solar PV System
Reflex Labels · B/21/0479 · 1.6 mo to decide
0.25Awaiting Construction2021-12-22
Pinguin Foods
Pinguin Foods Ltd · B/15/0113 · 3.5 mo to decide
1.5Operational2015-06-11
Kirton Solar PV Farm
Ethical Power · B/15/0001 · 5.3 mo to decide
3.2Operational2015-05-07
Friths Farm
Friths Solar Limited · B/14/0287 · 2.2 mo to decide
28Planning Permission Expired2014-10-09
Nowhere Farm
Estover Energy · B/14/0267 · 2.5 mo to decide
8.1Operational2014-09-17
Fen Road
Lark Energy · B/13/0345 · 3 mo to decide
1.4Operational2013-12-10
Leverton Ings
Hazel Capital LLP · B/13/0306 · 2 mo to decide
12Operational2013-10-15

Does Boston approve solar farms?

Yes — of the 14 solar farms Boston has decided, 100% were approved (14 granted, 0 refused). The UK-wide rate for solar is 93%.

How long does a solar farm application take in Boston?

The median time from application to decision is 2.7 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Boston consented?

119 MW has been consented across 14 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Boston

Battery storage in BostonOnshore wind in Boston

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.