Riverside Industrial Estate Gasification Plant is an operational 10.5 MW advanced conversion plant in Boston, generating since 15 March 2018. Planning permission was granted on 7 September 2010, 9 months after submission. Operator of record: Alternative Use Group plc & Alchemy Farms.

10.5 MW
Capacity
as recorded in REPD
Operational
Status
since 15 March 2018
Advanced Conversion Technologies
Technology
Alternative Use Group plc & Alchemy Farms
Boston
Authority
England

Planning and build timeline

Application submitted14 December 2009
Permission granted7 September 2010
9 months after submission
Operational15 March 2018
90 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Boston: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Riverside Industrial Estate Gasification Plant’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
0.890.6 km
Solar Photovoltaics · Under Construction
9.70.9 km
Solar Photovoltaics · Operational
1.51 km
Landfill Gas · Operational
1.31.3 km
Solar Photovoltaics · Operational
1.44.1 km
Solar Photovoltaics · Operational
3.26.3 km
Solar Photovoltaics · Operational
56.5 km
Solar Photovoltaics · Operational
8.17.1 km

How big is Riverside Industrial Estate Gasification Plant?

Riverside Industrial Estate Gasification Plant has a recorded installed capacity of 10.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Riverside Industrial Estate Gasification Plant?

REPD records the operator as Alternative Use Group plc & Alchemy Farms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Riverside Industrial Estate Gasification Plant approved and built?

The application was submitted on 14 December 2009. Permission was granted on 7 September 2010, 9 months later. The site became operational on 15 March 2018, 90 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 118.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode