Renewable sites › Riverside Industrial Estate Gasification Plant
Riverside Industrial Estate Gasification Plant
Riverside Industrial Estate Gasification Plant is operational in Boston with a recorded capacity of 10.5 MW, and has been generating since 2018-03-15.
Planning and build timeline
| Application submitted | 2009-12-14 |
| Permission granted | 2010-09-07 9 months after submission |
| Operational | 2018-03-15 90 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 1 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Marsh Lane - Solar PV Panels Solar Photovoltaics · Under Construction | 0.89 | 0.6 km |
Boston Landfill, Wyberton - Solar PV Array Solar Photovoltaics · Under Construction | 9.7 | 0.9 km |
Pinguin Foods Solar Photovoltaics · Operational | 1.5 | 1 km |
Boston Landfill Scheme Landfill Gas · Operational | 1.3 | 1.3 km |
Fen Road Solar Photovoltaics · Operational | 1.4 | 4.1 km |
Kirton Solar PV Farm Solar Photovoltaics · Operational | 3.2 | 6.3 km |
Canopus Farm Solar Photovoltaics · Operational | 5 | 6.5 km |
Nowhere Farm Solar Photovoltaics · Operational | 8.1 | 7.1 km |
How big is Riverside Industrial Estate Gasification Plant?
Riverside Industrial Estate Gasification Plant has a recorded installed capacity of 10.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Riverside Industrial Estate Gasification Plant?
REPD records the operator as Alternative Use Group plc & Alchemy Farms. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Riverside Industrial Estate Gasification Plant approved and built?
The application was submitted on 2009-12-14. Permission was granted on 2010-09-07, 9 months later. The site became operational on 2018-03-15, 90 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 118.
Novarly Parcel · official public data, read properly · parcel.novarly.com