Marsh Lane - Solar PV Panels

Marsh Lane - Solar PV Panels is under construction in Boston with a recorded capacity of 0.89 MW.

0.89 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Howard Tenens Limited
Boston
Authority
England

Planning and build timeline

Application submitted2022-04-19
Permission grantednot recorded
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Boston’s record on solar

Boston has decided 14 solar farms and approved 100%, taking a median of 2.7 months. See every solar farm decision in Boston

Other built sites within 15 km

SiteMWDistance
Pinguin Foods
Solar Photovoltaics · Operational
1.50.4 km
Riverside Industrial Estate Gasification Plant
Advanced Conversion Technologies · Operational
10.50.6 km
Boston Landfill, Wyberton - Solar PV Array
Solar Photovoltaics · Under Construction
9.71.4 km
Boston Landfill Scheme
Landfill Gas · Operational
1.31.8 km
Fen Road
Solar Photovoltaics · Operational
1.43.7 km
Canopus Farm
Solar Photovoltaics · Operational
55.9 km
Kirton Solar PV Farm
Solar Photovoltaics · Operational
3.26.3 km
Nowhere Farm
Solar Photovoltaics · Operational
8.17.2 km

How big is Marsh Lane - Solar PV Panels?

Marsh Lane - Solar PV Panels has a recorded installed capacity of 0.89 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Marsh Lane - Solar PV Panels?

REPD records the operator as Howard Tenens Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Marsh Lane - Solar PV Panels approved and built?

The application was submitted on 2022-04-19. REPD does not record a grant date. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12720.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council