Renewable sites › Canopus Farm
Canopus Farm
Canopus Farm is operational in East Lindsey with a recorded capacity of 5 MW, and has been generating since 2015-12-10.
Planning and build timeline
| Application submitted | 2015-01-05 |
| Permission granted | 2015-03-26 3 months after submission |
| Operational | 2015-12-10 9 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
East Lindsey’s record on solar
East Lindsey has decided 28 solar farms and approved 100%, taking a median of 3 months. See every solar farm decision in East Lindsey →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Fen Road Solar Photovoltaics · Operational | 1.4 | 5 km |
Pinguin Foods Solar Photovoltaics · Operational | 1.5 | 5.5 km |
Marsh Lane - Solar PV Panels Solar Photovoltaics · Under Construction | 0.89 | 5.9 km |
Staples Anaerobic Digestion CHP Plant (Waste AD) Anaerobic Digestion · Operational | 1.4 | 6.4 km |
Riverside Industrial Estate Gasification Plant Advanced Conversion Technologies · Operational | 10.5 | 6.5 km |
Carrington Farm AD Anaerobic Digestion · Operational | 3 | 6.8 km |
Boston Landfill, Wyberton - Solar PV Array Solar Photovoltaics · Under Construction | 9.7 | 7.1 km |
Boston Landfill Scheme Landfill Gas · Operational | 1.3 | 7.6 km |
How big is Canopus Farm?
Canopus Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Canopus Farm?
REPD records the operator as Countryside Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Canopus Farm approved and built?
The application was submitted on 2015-01-05. Permission was granted on 2015-03-26, 3 months later. The site became operational on 2015-12-10, 9 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4951.