Lapwing Fen 2 - Battery Storage Plant

Lapwing Fen 2 - Battery Storage Plant is under construction in King's Lynn and West Norfolk with a recorded capacity of 250 MW.

250 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Tribus Clean Energy
King's Lynn and West Norfolk
Authority
England

Planning and build timeline

Application submitted2019-11-25
Permission granted2020-04-27
5 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

King's Lynn and West Norfolk’s record on battery storage

King's Lynn and West Norfolk has decided 15 battery storage schemes and approved 100%, taking a median of 6.7 months. See every battery storage scheme decision in King's Lynn and West Norfolk

Other built sites within 15 km

SiteMWDistance
Walpole Bank
Solar Photovoltaics · Under Construction
402 km
Rose And Crown Farm
Solar Photovoltaics · Operational
302.5 km
The Grange Wind Farm
Wind Onshore · Operational
142.5 km
Sutton Bridge Solar Farm
Solar Photovoltaics · Operational
49.93.5 km
Long Sutton Butterfly And Wildlife Park
Solar Photovoltaics · Operational
1.77.3 km
Long Sutton Butterfly And Wildlife Park (extension)
Solar Photovoltaics · Operational
17.3 km
Grange Farm (Lincolnshire)
Solar Photovoltaics · Operational
12.78.4 km
Volmary Site
Solar Photovoltaics · Operational
0.29.1 km

How big is Lapwing Fen 2 - Battery Storage Plant?

Lapwing Fen 2 - Battery Storage Plant has a recorded installed capacity of 250 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lapwing Fen 2 - Battery Storage Plant?

REPD records the operator as Tribus Clean Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lapwing Fen 2 - Battery Storage Plant approved and built?

The application was submitted on 2019-11-25. Permission was granted on 2020-04-27, 5 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7614.