Sutton Bridge Solar Farm

Sutton Bridge Solar Farm is operational in South Holland with a recorded capacity of 49.9 MW, and has been generating since 2024-04-01.

49.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2024-04-01
Solar Photovoltaics
Technology
EDF Energy Renewables
South Holland
Authority
England

Planning and build timeline

Application submitted2020-12-11
Permission granted2021-01-26
2 months after submission
Operational2024-04-01
38 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Holland’s record on solar

South Holland has decided 24 solar farms and approved 88%, taking a median of 2.5 months. See every solar farm decision in South Holland

Other built sites within 15 km

SiteMWDistance
The Grange Wind Farm
Wind Onshore · Operational
142 km
Lapwing Fen 2 - Battery Storage Plant
Battery · Under Construction
2503.5 km
Walpole Bank
Solar Photovoltaics · Under Construction
403.9 km
Rose And Crown Farm
Solar Photovoltaics · Operational
305 km
Long Sutton Butterfly And Wildlife Park (extension)
Solar Photovoltaics · Operational
15.3 km
Long Sutton Butterfly And Wildlife Park
Solar Photovoltaics · Operational
1.75.4 km
Grange Farm (Lincolnshire)
Solar Photovoltaics · Operational
12.79.7 km
Gedney Marsh
Wind Onshore · Operational
1210.5 km

How big is Sutton Bridge Solar Farm?

Sutton Bridge Solar Farm has a recorded installed capacity of 49.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sutton Bridge Solar Farm?

REPD records the operator as EDF Energy Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sutton Bridge Solar Farm approved and built?

The application was submitted on 2020-12-11. Permission was granted on 2021-01-26, 2 months later. The site became operational on 2024-04-01, 38 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 16008.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council