Walpole Bank

Walpole Bank is a 40 MW solar farm under construction in King's Lynn and West Norfolk. Planning permission was granted on 15 January 2021, 4 months after submission. Operator of record: DIF Capital Partners / Green Investment Group.

40 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
DIF Capital Partners / Green Investment Group
King's Lynn and West Norfolk
Authority
England

Planning and build timeline

Application submitted25 September 2020
Permission granted15 January 2021
4 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

King's Lynn and West Norfolk approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Walpole Bank’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

King's Lynn and West Norfolk’s record on solar

King's Lynn and West Norfolk has decided 31 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in King's Lynn and West Norfolk

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
301.2 km
Battery · Under Construction
2502 km
Wind Onshore · Operational
143.8 km
Solar Photovoltaics · Operational
49.93.9 km
Solar Photovoltaics · Operational
18.7 km
Solar Photovoltaics · Operational
1.78.7 km
Solar Photovoltaics · Operational
3.59.8 km
Solar Photovoltaics · Operational
0.29.8 km

How big is Walpole Bank?

Walpole Bank has a recorded installed capacity of 40 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Walpole Bank?

REPD records the operator as DIF Capital Partners / Green Investment Group. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Walpole Bank approved and built?

The application was submitted on 25 September 2020. Permission was granted on 15 January 2021, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9524.