Renewable sitesVolmary Site

Volmary Site

Volmary Site is operational in Fenland with a recorded capacity of 0.2 MW, and has been generating since 2019-07-31.

0.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2019-07-31
Solar Photovoltaics
Technology
Volmary
Fenland
Authority
England

Planning and build timeline

Application submitted2019-01-24
Permission granted2019-03-22
2 months after submission
Operational2019-07-31
4 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Fenland’s record on solar

Fenland has decided 22 solar farms and approved 91%, taking a median of 2.8 months. See every solar farm decision in Fenland

Other built sites within 15 km

SiteMWDistance
Wisbech Solar Farm
Solar Photovoltaics · Operational
3.55.1 km
Coldham Hall
Wind Onshore · Operational
146.5 km
Coldham
Wind Onshore · Operational
167 km
Whitemill Wind Farm
Wind Onshore · Operational
148.1 km
Rose And Crown Farm
Solar Photovoltaics · Operational
308.8 km
Wryde Croft
Wind Onshore · Operational
269 km
Lapwing Fen 2 - Battery Storage Plant
Battery · Under Construction
2509.1 km
Long Hill Road
Wind Onshore · Operational
29.7 km

How big is Volmary Site?

Volmary Site has a recorded installed capacity of 0.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Volmary Site?

REPD records the operator as Volmary. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Volmary Site approved and built?

The application was submitted on 2019-01-24. Permission was granted on 2019-03-22, 2 months later. The site became operational on 2019-07-31, 4 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7298.