Novarly ParcelRenewable sites

Renewable sitesGrange Farm (Lincolnshire)

Grange Farm (Lincolnshire)

Grange Farm (Lincolnshire) is operational in South Holland with a recorded capacity of 12.7 MW, and has been generating since 2015-03-30.

12.7 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-30
Solar Photovoltaics
Technology
Green Switch Solutions
South Holland
Authority
England

Planning and build timeline

Application submitted2013-11-01
Permission granted2014-03-19
5 months after submission
Operational2015-03-30
12 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Holland’s record on solar

South Holland has decided 24 solar farms and approved 88%, taking a median of 2.5 months. See every solar farm decision in South Holland

Other built sites within 15 km

SiteMWDistance
Long Sutton Butterfly And Wildlife Park
Solar Photovoltaics · Operational
1.77.5 km
Long Sutton Butterfly And Wildlife Park (extension)
Solar Photovoltaics · Operational
17.6 km
The Grange Wind Farm
Wind Onshore · Operational
147.8 km
Lapwing Fen 2 - Battery Storage Plant
Battery · Under Construction
2508.4 km
Sutton Bridge Solar Farm
Solar Photovoltaics · Operational
49.99.7 km
Volmary Site
Solar Photovoltaics · Operational
0.210 km
Manor Farm (Farm AD)
Anaerobic Digestion · Operational
1.510.2 km
Walpole Bank
Solar Photovoltaics · Under Construction
4010.4 km

How big is Grange Farm (Lincolnshire)?

Grange Farm (Lincolnshire) has a recorded installed capacity of 12.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Grange Farm (Lincolnshire)?

REPD records the operator as Green Switch Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Grange Farm (Lincolnshire) approved and built?

The application was submitted on 2013-11-01. Permission was granted on 2014-03-19, 5 months later. The site became operational on 2015-03-30, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2366.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council