Renewable sites › Grange Farm (Lincolnshire)
Grange Farm (Lincolnshire)
Grange Farm (Lincolnshire) is an operational 12.7 MW solar farm in South Holland, generating since 30 March 2015. Planning permission was granted on 19 March 2014, 5 months after submission. Operator of record: Green Switch Solutions.
Planning and build timeline
| Application submitted | 1 November 2013 |
| Permission granted | 19 March 2014 5 months after submission |
| Operational | 30 March 2015 12 months after consent |
Screening a site of your own?
South Holland approves 88% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Grange Farm (Lincolnshire)’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
South Holland’s record on solar
South Holland has decided 24 solar farms and approved 88%, taking a median of 2.5 months. See every solar farm decision in South Holland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 1.7 | 7.5 km |
Solar Photovoltaics · Operational | 1 | 7.6 km |
Wind Onshore · Operational | 14 | 7.8 km |
Battery · Under Construction | 250 | 8.4 km |
Solar Photovoltaics · Operational | 49.9 | 9.7 km |
Solar Photovoltaics · Operational | 0.2 | 10 km |
Anaerobic Digestion · Operational | 1.5 | 10.2 km |
Solar Photovoltaics · Under Construction | 40 | 10.4 km |
How big is Grange Farm (Lincolnshire)?
Grange Farm (Lincolnshire) has a recorded installed capacity of 12.7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Grange Farm (Lincolnshire)?
REPD records the operator as Green Switch Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Grange Farm (Lincolnshire) approved and built?
The application was submitted on 1 November 2013. Permission was granted on 19 March 2014, 5 months later. The site became operational on 30 March 2015, 12 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2366.
Novarly Parcel · official public data, read properly · parcel.novarly.com