Renewable sitesLong Sutton Butterfly And Wildlife Park (extension)

Long Sutton Butterfly And Wildlife Park (extension)

Long Sutton Butterfly And Wildlife Park (extension) is operational in South Holland with a recorded capacity of 1 MW, and has been generating since 2011-07-14.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-07-14
Solar Photovoltaics
Technology
Moor Solar
South Holland
Authority
England

Planning and build timeline

Application submitted2011-03-18
Permission granted2011-04-28
1 months after submission
Operational2011-07-14
3 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 1 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

South Holland’s record on solar

South Holland has decided 24 solar farms and approved 88%, taking a median of 2.5 months. See every solar farm decision in South Holland

Other built sites within 15 km

SiteMWDistance
Long Sutton Butterfly And Wildlife Park
Solar Photovoltaics · Operational
1.70.1 km
The Grange Wind Farm
Wind Onshore · Operational
144.9 km
Sutton Bridge Solar Farm
Solar Photovoltaics · Operational
49.95.3 km
Gedney Marsh
Wind Onshore · Operational
125.5 km
Manor Farm (Farm AD)
Anaerobic Digestion · Operational
1.56.2 km
Lapwing Fen 2 - Battery Storage Plant
Battery · Under Construction
2507.3 km
Grange Farm (Lincolnshire)
Solar Photovoltaics · Operational
12.77.6 km
Walpole Bank
Solar Photovoltaics · Under Construction
408.7 km

How big is Long Sutton Butterfly And Wildlife Park (extension)?

Long Sutton Butterfly And Wildlife Park (extension) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Long Sutton Butterfly And Wildlife Park (extension)?

REPD records the operator as Moor Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Long Sutton Butterfly And Wildlife Park (extension) approved and built?

The application was submitted on 2011-03-18. Permission was granted on 2011-04-28, 1 months later. The site became operational on 2011-07-14, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1050.