Solar planning in Caerphilly

Caerphilly has decided 7 solar farms and approved 100% of them, taking a median of 3.5 months to decide. Consented capacity: 49 MW.

100%
Approved
7 granted · 0 refused
3.5 mo
Median decision
UK 2.3 mo
49 MW
Consented
across approved schemes
0
Appeals
no appeals recorded

⚠️ Small caseload (7 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Caerphilly compares

Against the 298 UK authorities with 5+ solar decisions, Caerphilly sits in the 77th percentile for approval rate (7 points above the England average) and the 22nd percentile for speed.

Decisions by year

35Approved — 3 (2014)314Approved — 3 (2015)315Approved — 1 (2016)116
Approved Refused

Solar decisions by the year the decision was issued (Renewable Energy Planning Database). Withdrawn and still-undecided applications are excluded, so a short bar can mean a quiet year rather than a strict council.

Every recorded scheme (7)

SchemeMWStatusDecided
Land at Darran Farm
SRE (Darran) · 14/0455/FULL · 16.4 mo to decide
2.6Operational2016-03-10
Manmoel Road Solar Park
Pearmat Solar · 15/0433/FULL · 4.2 mo to decide
4.1Operational2015-11-05
Land At Cwm Bargoed
Kronos Solar/ Vogt Solar · P/15/0169 · 3.5 mo to decide
5Operational2015-09-17
Upper Pant-Ysgawen Farm/Crumlin
Suncredit UK · 15/0512/FULL · 1.6 mo to decide
4.9Operational2015-09-10
Penrhiwarwydd Farm
MTS Hill Farm Solar Ltd · 14/0512/FULL · 3.3 mo to decide
8.5Operational2014-11-07
Cwmcaesingrug Farm
Kronos Solar · 14/0276/FULL · 3.1 mo to decide
10Operational2014-08-08
Hendai Farm
Conergy UK · 13/0846/FULL · 4 mo to decide
13.4Operational2014-04-10

Does Caerphilly approve solar farms?

Yes — of the 7 solar farms Caerphilly has decided, 100% were approved (7 granted, 0 refused). The UK-wide rate for solar is 93%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a solar farm application take in Caerphilly?

The median time from application to decision is 3.5 months, against a UK median of 2.3 months for solar. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much solar capacity has Caerphilly consented?

49 MW has been consented across 7 approved schemes. There are no applications currently awaiting a decision.

Other technologies in Caerphilly

Battery storage in CaerphillyOnshore wind in Caerphilly

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.

Novarly Parcel · official public data, read properly · parcel.novarly.com