Novarly ParcelRenewable sites

Renewable sitesBryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission

Bryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission

Bryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission is operational in Rhondda Cynon Taf with a recorded capacity of 1 MW, and has been generating since 2015-09-15.

1 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-09-15
Anaerobic Digestion
Technology
Ancala Bioenergy (formerly Biogen)
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submitted2013-08-23
Permission granted2013-10-07
1 months after submission
Operational2015-09-15
23 months after consent

Other built sites within 15 km

SiteMWDistance
Mynydd Bwllfa Wind Farm - Resubmission
Wind Onshore · Operational
22.55.7 km
Enviroparks Hirwaun Generation Site
Advanced Conversion Technologies · Operational
207.2 km
Maerdy
Wind Onshore · Operational
247.2 km
Hirwaun Stor Generation - Battery Storage
Battery · Operational
21.767.3 km
Rhigos Road - Solar Farm
Solar Photovoltaics · Under Construction
9.887.6 km
Bryngolwg Farm, Hirwaun - Solar farm
Solar Photovoltaics · Operational
8.948.1 km
Pen Rhiw Caradog
Solar Photovoltaics · Operational
4.78.2 km
Land At Cwm Bargoed
Solar Photovoltaics · Operational
58.3 km

How big is Bryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission?

Bryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission?

REPD records the operator as Ancala Bioenergy (formerly Biogen). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bryn Pica AD / Tomorrow's Valley (Waste AD) - resubmission approved and built?

The application was submitted on 2013-08-23. Permission was granted on 2013-10-07, 1 months later. The site became operational on 2015-09-15, 23 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 261.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council