Renewable sites › Rigby Landfill
Rigby Landfill
Rigby Landfill is an operational 3 MW landfill gas site in Chorley, generating since 7 December 2009. Planning permission was granted on 7 October 2005, 3 months after submission. Operator of record: FCC Environment.
Planning and build timeline
| Application submitted | 24 June 2005 |
| Permission granted | 7 October 2005 3 months after submission |
| Operational | 7 December 2009 50 months after consent |
Screening a site of your own?
Redline runs the record on your own boundary in Chorley: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Rigby Landfill’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Chorley
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 4.6 km |
Battery · Operational | 30 | 4.7 km |
Landfill Gas · Operational | 2.1 | 7.2 km |
Landfill Gas · Operational | 4.5 | 7.7 km |
Wind Onshore · Operational | 2.3 | 11.1 km |
Battery · Operational | 30 | 11.9 km |
Battery · Under Construction | 5 | 12.1 km |
Landfill Gas · Operational | 2.3 | 12.2 km |
How big is Rigby Landfill?
Rigby Landfill has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rigby Landfill?
REPD records the operator as FCC Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rigby Landfill approved and built?
The application was submitted on 24 June 2005. Permission was granted on 7 October 2005, 3 months later. The site became operational on 7 December 2009, 50 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 787.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode