Novarly ParcelRenewable sites

Renewable sitesRigby Landfill

Rigby Landfill

Rigby Landfill is operational in Chorley with a recorded capacity of 3 MW, and has been generating since 2009-12-07.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2009-12-07
Landfill Gas
Technology
FCC Environment
Chorley
Authority
England

Planning and build timeline

Application submitted2005-06-24
Permission granted2005-10-07
3 months after submission
Operational2009-12-07
50 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Thompson House Equestrian farm
Solar Photovoltaics · Operational
54.6 km
Charnock Richard - Battery Storage
Battery · Operational
304.7 km
Kirkless Power
Landfill Gas · Operational
2.17.2 km
West Quarry
Landfill Gas · Operational
4.57.7 km
Mawdesley Moss
Wind Onshore · Operational
2.311.1 km
Atherton - Battery energy storage
Battery · Operational
3011.9 km
The Glowhouse
Battery · Under Construction
512.1 km
Withnell LFS
Landfill Gas · Operational
2.312.2 km

How big is Rigby Landfill?

Rigby Landfill has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rigby Landfill?

REPD records the operator as FCC Environment. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rigby Landfill approved and built?

The application was submitted on 2005-06-24. Permission was granted on 2005-10-07, 3 months later. The site became operational on 2009-12-07, 50 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 787.