Renewable sites › West Quarry
West Quarry
West Quarry is operational in West Lancashire with a recorded capacity of 4.5 MW, and has been generating since 1992-01-01.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 1992-01-01 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — West Lancashire
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Thompson House Equestrian farm Solar Photovoltaics · Operational | 5 | 3.2 km |
Charnock Richard - Battery Storage Battery · Operational | 30 | 4.3 km |
Sanko Gosei Solar Panels Solar Photovoltaics · Operational | 0.5 | 5.7 km |
Unit 5 XL Business Park Battery · Under Construction | 49.9 | 5.9 km |
Lathom (Pilkington Technical Centre) Battery Storage Battery · Operational | 2 | 6.9 km |
Lathom (Pilkington Technical Centre) Solar Photovoltaics · Operational | 2.5 | 6.9 km |
Mawdesley Moss Wind Onshore · Operational | 2.3 | 6.9 km |
Rigby Landfill Landfill Gas · Operational | 3 | 7.7 km |
How big is West Quarry?
West Quarry has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates West Quarry?
REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was West Quarry approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 1992-01-01.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 696.