Renewable sites › Charnock Richard - Battery Storage
Charnock Richard - Battery Storage
Charnock Richard - Battery Storage is operational in Chorley with a recorded capacity of 30 MW, and has been generating since 2026-02-03.
Planning and build timeline
| Application submitted | 2022-02-22 |
| Permission granted | 2022-05-27 3 months after submission |
| Operational | 2026-02-03 44 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — Chorley
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Thompson House Equestrian farm Solar Photovoltaics · Operational | 5 | 1.9 km |
West Quarry Landfill Gas · Operational | 4.5 | 4.3 km |
Rigby Landfill Landfill Gas · Operational | 3 | 4.7 km |
Mawdesley Moss Wind Onshore · Operational | 2.3 | 6.4 km |
Ulnes Walton Energy Landfill Gas · Operational | 1.3 | 8.7 km |
Sanko Gosei Solar Panels Solar Photovoltaics · Operational | 0.5 | 9.6 km |
The Glowhouse Battery · Under Construction | 5 | 9.6 km |
Unit 5 XL Business Park Battery · Under Construction | 49.9 | 9.8 km |
How big is Charnock Richard - Battery Storage?
Charnock Richard - Battery Storage has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Charnock Richard - Battery Storage?
REPD records the operator as Pulse Clean Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Charnock Richard - Battery Storage approved and built?
The application was submitted on 2022-02-22. Permission was granted on 2022-05-27, 3 months later. The site became operational on 2026-02-03, 44 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 20393.